Before you begin
You must add a meter to the equipment before you can record readings on it.
It is currently not possible to generate a work order with a meter reading or event trigger in v6.
Version: v6 (what does this mean?)
Plans: All plans
To record a meter reading:
- In Assets > Equipment, make sure that the Equipment button is selected:
- Click the name of the piece of equipment you want to record a reading for.
- Click the Maintenance Log tab:
- Expand the Meters section.
- In the row for the meter you want to record the reading against, enter the reading in the Add Meter Reading column:
- To save the reading, press the Enter key or click the checkmark next to the reading.