Before you begin
- If you're using v6 Equipment, it is currently not possible to generate a work order with a meter reading or event trigger.
- Asset events can be added and viewed in the Metering/Events tab on an asset. You can configure event types in Settings > CMMS Settings > Lookup Tables.
Permissions: Access to scheduled maintenance
Event triggers generate work orders when an asset event occurs on an associated asset.
To add an event trigger to a scheduled maintenance record:
- Navigate to the scheduled maintenance record you want to add a trigger to in Maintenance > Scheduled Maintenance.
- Click the Scheduling tab:
- Specify whether the to generate a work order upon all of the triggers being satisfied, or any of the triggers, by selecting the corresponding option in the tab:
- Click the Add icon at the bottom left of the table:
- In the Scheduled Maintenance Trigger window, select Generate Work Order By Event Trigger:
- If this is a multi-asset scheduled maintenance record, select the asset for this trigger:
- Select the asset event for the trigger:
- Click OK.
- Click Save in the top menu bar.